the project
- Fuller Constructions was engaged to undertake a failed redevelopment started by another building company
- the project was a large commercial shed located in Gladstone
- the shed was divided into three tenancies.
the materials
- for this project due to the purpose of the shed, durable materials were used
- cost effective modern looks materials were also used to achieve a fresh non dated look.
the details
- the area required a full decommission and striping of all old works
- the project included construction and installation of:
- partitions and walls
- stairs, including on site welding and construction
- electrical
- mechanical ventilation
- air conditioning
- plumbing
- general works.
- this project also encompassed the conversion of an old hard stand area into a general car park and thoroughfare, which included concreting and line marking also.
the outcome
- Fuller Constructions provided their own full team of trades for this project
- the project was delivered within the timeframe
- the client was very happy with their completed shed finally!
view our recent projects ...
![new home build -Mooloolaba](https://www.fullerconstructions.com.au/wp-content/uploads/2021/03/c-Custom-510x382.jpg)
![commercial build – office car park Gladstone](https://www.fullerconstructions.com.au/wp-content/uploads/2016/10/10-2-510x382.jpg)
![commercial build – office fitout Gladstone](https://www.fullerconstructions.com.au/wp-content/uploads/2016/10/11-510x382.jpg)
![commercial build – commercial shed Gladstone](https://www.fullerconstructions.com.au/wp-content/uploads/2016/10/13-510x382.jpg)
![commercial build – medical centre Hervey Bay](https://www.fullerconstructions.com.au/wp-content/uploads/2016/10/IMG_9460-510x382.jpg)
![new home build – Glasshouse Mountains](https://www.fullerconstructions.com.au/wp-content/uploads/2016/07/1450_3068637_280816051508_6505-510x382.jpg)